Holy Trinity Upper School

Holy Trinity Upper School

Washington DC

School Square Feet: 29,300

Construction Budget:$4,500,000

HVAC Scope: New 100% variable air volume outside air unit with variable air volume terminal units controlled by CO2 sensors.

Plumbing Scope: New sanitary waste and vent piping to new plumbing fixtures. New Domestic hot water heater. New domestic water distribution to new plumbing fixtures. New science lab chemical waste and vent system. New science labs emergency shower and eyewash.

Electrical Scope: New power distribution throughout. New lighting system wiring and control. New theatrical lighting system wiring and control.

Fire Protection Scope: Updated fire alarm system.